Guide

Preparing the site and the foundation slab

A prefabricated steel building goes up quickly, but only on a site that is ready for it. This guide lists what is usually prepared before erection starts.

Back to the guides

Steel frame on its foundations

Checklist

Before erection starts

Location and permit

Make sure the building may stand where you plan it and that the permit, where one is needed, is in place before groundwork begins.

Groundwork

Remove topsoil and vegetation where the building will stand, so that the foundations rest on firm, even ground.

Foundations to the design

The foundation slab or the individual foundations are built to the structural design of your building; their size and reinforcement and the positions of the anchor points follow from that design.

A level base for the frame

The steel columns are anchored to the foundations, so their top must be level and the anchor points placed exactly as drawn.

Services first

Plan ducts for electricity and water and the drainage of the downpipes before the concrete is poured.

Access

Lorries bringing the steel and the panels, and the machines used for erection, need firm access to the site.

Time for the concrete

Erection can start once the concrete has gained enough strength; the contractor who pours it will tell you when.

Ask us

What your slab needs

Ask us which dimensions and anchor positions your contractor needs for our building; they follow from its design.

Our advisers will gladly help you plan the order of work so that the site is ready when the structure arrives.